19th March Inside has been cleaned up and it is all looking good although it is now quite messy again, but the brick issue was still continuing.
kitchen
Photobucket
kitchen

Outside was cleaned up after many complaints from the neighbours- the mess was terrible and embarrassing. (you can see some of it in previous photos)


site has been cleaned up


side and backyard, all cleaned up

20th March Carpet is in (vintage leather)


carpet in... 20th March




On 31st March we had our PC inspection with many painting and wall alignment issues, as well as a couple of other things such as the bath and spout not aligning, and it is all all connected up.

Photobucket


Since the PC inspection very little has been done, none of the walls or paint issues have been touched, neither has the bath, which is also not centered. There are also doors which have been damaged and need replacing. All that seems to have been done is the realignment of cupboard doors in the kitchen and a power point has been replaced. Outside also still needs painting- including alfresco, entry porch render and above all windows and doors and the front door. I don’t think our handover will be next week as we were told before Easter. One thing we defiantly recommend is having an independent inspector through your home.

We continue to wait for work to be done and for contact from the SS ans CSC, which surprises me now that we are 5 weeks into the “they pay us” period